A plastics injection Company in Louisville, KY.

This growing company's need for additional production and office area involved the design and installation of over one hundred thirty tons of heating and cooling. Large amount of ventilation would also be required. The HVAC design supplied by SDI was based on roof top installation. Several local crane companies were not able to supply equipment for these lifts due to roof size and surrounding ground conditions. 'Helicopter Transport' from Chicago, IL was contracted to lift over ten tons of equipment to Hi-Tech's roof. Nine-teen lifts and a couple of hours,  the job was completed.

 

Helicopter on site for lift.       

  Three York Mellenium 40 Ton RTU & one 12.5 Ton Predator.

 

 

Solar Crew discuss lifts with Pilots.

 

Helicopter sets down for final HVAC equipment rigging.